Panjang Utara Beacon, Johor, Malaysia

2011

The SPLASHpro M1-80 system was supplied and installed at the piles of the Beacon structure, off the coast of Johor, Malaysia.

The SPLASHpro M-1 80 System comprised STACprime UW, STACfill, STACwrap (150mm & 300 mm), STACguard, SS317L band (12.5mm/0.76mm) and SS316 Buckle.